Every demand forecast is wrong. That is not a reason to throw the forecast out, and it is not a reason to hide the error. The useful questions are how wrong, in which direction, on which items, and whether you can still defend the action you want to take this week.
Accuracy and bias are different jobs. Accuracy — MAPE, or, better when item volumes are mixed, weighted MAPE — tells you how large the misses were. Bias tells you whether you are consistently high or consistently low. A forecast can be fairly accurate and still dangerous if it is biased high for six months: you will overstock and then congratulate yourself on service. A forecast can also look accurate on quiet months and then fail you the moment demand steps up. That is why a single forecast-accuracy percentage for the whole company is a weak management metric. You need the item, the time window, and both measures.
Why the number drifts
Forecasts go wrong for ordinary reasons. The history includes a one-off project, a data gap, or returns coded as demand. Someone changed the unit of measure and did not say so. A promotion, a season, or a lost customer never made it into the plan. Lead times moved and the forecast was still being used as if supply were instant. A single-number plan was negotiated in a meeting until it was palatable, and the statistical baseline was quietly replaced. None of this is exotic. It is the weekly life of a mid-market planning team working from any ERP or business system, plus spreadsheets.
Forecast accuracy
Calder & Finch demo inputs, not a customer resultActuals are the last ten months of CF-VLV-2077 in the Calder & Finch demo. The forecast is an illustrative flat 40-unit plan, not a Silona output.
| Period | Actual | Forecast |
|---|---|---|
| Month 27 | ||
| Month 28 | ||
| Month 29 | ||
| Month 30 | ||
| Month 31 | ||
| Month 32 | ||
| Month 33 | ||
| Month 34 | ||
| Month 35 (step change) | ||
| Month 36 (step change) |
This is a sketch from the inputs you type. It is not a quote, a forecast or a result from any company.
Type your own actuals and forecasts, or keep the demo series and drop the last two months to see how pretty the numbers looked before the step change. MAPE is the mean of the absolute percentage errors, and it skips periods with zero actual demand. WMAPE is the sum of absolute errors divided by the sum of actuals. Bias is (sum of forecasts minus sum of actuals) divided by the sum of actuals. Positive bias means the forecast is high.
Defend the recommendation, not the algorithm
A recommendation is only as good as your ability to defend it. When purchasing asks why you want to pull in a shipment, "the system said so" will not survive the meeting. You need the inputs, the change since last time, and the risk if you do nothing. If demand jumped, say so, and show the last review next to today. If a supplier confirmation slipped, show that. If the recommendation is based on a missing lead time or a stale on-hand, say that too — and do not act as if the number were solid. The point of a planning tool is not to replace the planner. It is to put the evidence on the table so the planner can make, and later explain, the call.
That is also how you keep a bad forecast from turning into a bad inventory policy. Safety stock and buy quantities will chase a biased forecast. If you do not separate "the forecast moved" from "the world moved," you will tighten or loosen buffers for the wrong reason. After you accept, change or reject a recommendation, leave a note. Next week's you is a different person, and so is the buyer who will ask.
MAPE and WMAPE will also disagree when a few large items dominate the total. That is not a bug. WMAPE is usually the fairer number when you are talking about cash, because a 50% miss on a cheap, quiet part should not outweigh a 10% miss on the part that fills the warehouse. If finance asks for one chart, show WMAPE and bias by class, not a single company MAPE. Review those figures on the same cadence as your planning cycle, not once a year.
Silona is built around that kind of defense. Recommendations come with the working, and with a view of what changed since the last review in demand, lead time and supplier confirmations. Missing or stale data is flagged, and nothing is ordered on its own. The planner accepts, changes or rejects each one. It works with any ERP or business system, plus spreadsheets. There is no upfront cost; Silona is paid from a share of verified savings. If you want to size the opportunity first, use the savings estimator, or look at the no-cost pilot process — both start from your numbers, not from a promised result.
Try this Monday
A short list you can finish in one sitting
- 1Compute WMAPE and bias for one family, and again after you isolate the last two months, so a recent step change cannot hide in an average.
- 2For every item on this week's action list, write one sentence on what changed since the last review.
- 3Flag any action whose lead time, on-hand or supplier date is missing or older than your comfort rule, and fix the input before you approve it.
- 4Leave a short note on the decisions you make, including the ones you reject.