- Mark a part as hot from its item page, a stockout exception, a PO action, or the Hot parts page. Silona also suggests candidates; nothing is added without a planner confirming it.
- Each hot part has one owner, a reason, a required-by date, linked POs, the shortage from the plan, a status and a next follow-up.
- Alerts fire when a follow-up is overdue, a supply date slips, or supply lands too close to the required-by date.
- The Today view is built for a phone: the list to chase this morning.
Hot part tracker
Keep a short list of parts that threaten a line or a promise, each with an owner, a required-by date and a daily follow-up.
Hot parts Opens Silona (sign-in needed)